Jello Wall

Lisa Hein & Robert Seng: Construction performance with Jello, gypsum, Durawall truss 152" x 8" x increasing height.

Jello wall partway through 3-week construction performance. Jello and mortar mixed, cooked and assembled on site. Decay attacks lower layers even as construction continues on top.



Previously, previously, previously, previously.

Tags: ,

3 Responses:

  1. Laura Rubin says:

    Relevant to my interests.

  2. gmontag says:

    Well, it's no bookshelf out of mashed potatoes.

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook

You may use these HTML tags and attributes: <a href="" title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong> <img src="" width="" height="" style=""> <object data="" type="" width="" height=""> <param name="" value=""> <embed src="" type="" width="" height=""> <blink> <tt> <u>, or *italics*.